E7142 2U CS sample build date 09/02’24,
09/05’24, 09/06’24 fall on week 36, while 10/09’24 fall on week 41 (red box).
E7142 1U CS sample build date 09/25’24 fall
on week 39, while 10/08’24 fall on week 41 (red box).
Every S/N for E7142 both 1U and 2U which
fall on week 35 to week 42 (year 2024) are
considered CS DVT sample.
For example:
R2520G6 S/N: LD2243500011 means this R2520G6 build date is on year 2024 week 35, which fall on
week 35 to 42, so it is considered as CS DVT sample.